Skip to Content
chevron-left chevron-right chevron-up chevron-right chevron-left arrow-back star phone quote checkbox-checked search wrench info shield play connection mobile coin-dollar spoon-knife ticket pushpin location gift fire feed bubbles home heart calendar price-tag credit-card clock envelop facebook instagram twitter youtube pinterest yelp google reddit linkedin envelope bbb pinterest homeadvisor angies
San Jose Airport PD Project

Nov 06, 2023 | Dave T Falk | Bid Results, Events & Milestones, Falk News, New Project Announcement

DL Falk is the apparent low bidder for the new San Jose Airport police Hanger Project with a low lump sum bid of $12,660,000. This project consists of a new operations facility for the local police aviation department located at San Jose International Airport.

Fire Station #8

June 16, 2023 | Dave T Falk | Bid Results, Events & Milestones, Falk News, New Project Announcement

DL Falk is the apparent low bidder for the new Fire Station #8 Project with a low lump sum bid of $10,526,000. This project plans to break ground in August 2023 and consists of a new facility, communication systems, and various site work improvements.

Lathrop Property & Evidence Building

June 16, 2023 | Dave T Falk | Bid Results, Events & Milestones, Falk News, New Project Announcement

DL Falk has been awarded the contract for the new Lathrop Property & Evidence Building with a low lump sum bid of $5,494,000. This new CMU building consists of state of the art MEP systems and new adjacent hardscape improvements.

DL Falk Apparent Low Bidder for Folsom Fire Station #34

April 18, 2023 | Dave T Falk | Bid Results, Events & Milestones, Falk News, New Project Announcement

DL Falk is the apparent low bidder for the Folsom Fire Station #34 Project which a low lump sum bid of $8,894,632. This project includes a new building facility, MEP systems, exterior improvements, landscaping, and finishes.

DL Falk Awarded CV Operations & Engineering Bldg. Project

December 23, 2022 | Dave T Falk | Bid Results, Events & Milestones, Falk News, New Project Announcement

DL Falk was awarded the CV Operations & Engineering Bldg. with a low lump sum bid of $20,844,000.00.

This new build project includes substantial structural steel components, new site and utility systems, and new state of the art MEP systems throughout. Construction plans to start in early 2023!

DLF Low Bidder for the Santa Teresa HS – New Classrooms Building Project

May 27, 2022 | Dave T Falk | Bid Results, Events & Milestones, Falk News, New Project Announcement

DLF is the apparent low bidder for the Santa Teresa HS New Classrooms Building with a low lump sum bid of $10,500,000. This is a school project and will provide future students added space at Santa Teresa HS. The new building will include structural, framing, MEP, and interior/exterior finishes.

DLF Low Bidder for the NMWD Admin. & Lab. Building Upgrades Project

May 27, 2022 | Dave T Falk | Bid Results, Events & Milestones, Falk News, New Project Announcement

DLF is the apparent low bidder for the NMWD Admin. & Lab. Building Upgrades Project with a low lump sum bid of $11,000,000. This Project is an extensive remodel that includes bringing the existing building to its original studs and rebuilding with all new finishes and MEP systems.

DL Falk Apparent Low Bidder for Sullivan Project

February 22, 2022 | Dave T Falk | Bid Results, Events & Milestones, Falk News, New Project Announcement

DL Falk is the apparent low bidder for the Sullivan Project in Fairfield!

The low lump sum bid of $5,064,000.00 includes a scope of work that will remodel existing District infrastructure along with adding new MEP systems, site work, and finishes.

DL Falk – Low Bidder for Fire Station #77 Project

December 17, 2021 | Dave T Falk | Bid Results, Events & Milestones, Falk News, New Project Announcement

DL Falk is the apparent low bidder for the Fire Station #77 Project in Elk Grove. This new station has a contract value of $9,000,000 and consists of all new utility and structural components, new MEP systems and finishes throughout, including new landscaping and exterior furnishings.

DL Falk – Low Bidder for Fairfield New Fields Project

August 17, 2021 | Dave T Falk | Bid Results, Events & Milestones, Falk News, New Project Announcement

DL Falk was the apparent low bidder for the Fairfield New Baseball Fields Project with a low lump sum bid of $6,246,000. This project encompasses new site work, baseball diamonds/back stops, new sod, irrigation systems, and CMU structures.

Contact Falk Construction Today